School Playground
Equipment UK
Get quotes
Menu

EYFS outdoor play equipment

An early years outdoor area is a classroom without a roof. Children under five learn to balance, share, dig, build and talk out there, and the EYFS statutory framework expects settings to give them daily outdoor activity where they can.

Good EYFS areas mix a small amount of fixed equipment with plenty of loose parts and open ground. This page covers the fixed part: what to install, how much space it takes and what it costs.

Get free quotes

£6k to £20k

an early years climbing and play unit, installed, before VAT

When an early years area needs work

  • Reception children use the main playground and get knocked over at break.
  • The outdoor area is tarmac only, with nowhere to climb, dig or hide.
  • Staff carry everything out and back in each day because there is no storage.
  • The area floods or turns to mud and is closed for weeks in winter.
  • There is no shade, so the area cannot be used on hot summer afternoons.
  • An Ofsted or local authority visit noted limited outdoor provision.

What early years equipment costs

ItemGuide, before VAT
Early years climbing unit
Low decks, small slide, tunnels and steps
£6,000 to £20,000
Playhouse or den
Role play, reading or quiet space
£4,000 to £12,000
Low balance trail
Stepping logs, beams and posts
£2,000 to £8,000
Wetpour, coloured, 40 mm
Per m², tested to a 1.3 m fall, on an existing base
£95.10
Whole EYFS area redesign
Public contract award, a primary school in Peterborough, 2024
£169,535
Where these figures come from

Installed prices per item come from the indicative supply, installation and surfacing costs a Scottish council publishes for community groups (The Highland Council, November 2021). Prices have risen since, so treat them as the lower end for 2026 and allow a margin. Wetpour rates are from a published UK price list, June 2026, supply and lay on an existing base. All before VAT. A guide, not a quote. The redesign figure is a published contract award (Contracts Finder) and covered design and works across a whole early years area.

Plan your play space

What a strong EYFS outdoor area includes

Low fixed climbing

Platforms under about 1 m, wide steps, ramps, a short slide and crawl-through tunnels. Low heights keep surfacing thin and impact areas small.

Places to be small

Dens, playhouses and a willow tunnel. Children under five need somewhere to retreat, talk and pretend.

Messy play

A mud kitchen, sand and water play with drainage under it. Put these near a tap and away from the door.

Ground that changes

Grass, mounds, a path loop for wheeled toys and a soft surface under anything to climb. Variety is the point.

Shade and shelter

A canopy or shade sail so the area works in rain and in July. Consider fixing points before the equipment goes in.

Storage at the door

A lockable outdoor store for loose parts, bikes and blocks, so the space can be set up in minutes.

Fixed equipment or loose parts?

Fixed equipment gives height, climbing and a focal point, but it is the most expensive thing per square metre and children can exhaust it quickly. Loose parts (crates, planks, tyres, tubes) cost little and keep play changing. The best areas spend most of the budget on the ground, shelter and storage and a modest share on one well-chosen climbing unit.

Safety without stripping the fun out

Early years equipment still falls under the BS EN 1176 standards. Below a fall height of 600 mm no special impact-absorbing surface is required, which is why many EYFS pieces are deliberately low. The HSE’s statement on children’s play is clear that the aim is to control real risks, not to remove all risk.

Want the area ready for September? Brief us before Easter.

Get free quotes

How an early years area project runs

  1. Brief and site visit

    Who the space is for, how many children use it at once, the area, the ground, and what you can spend. A good installer walks the site, checks access for machinery and asks about underground services.

  2. Design and price

    A scaled layout with each piece, its impact area and the surfacing, plus a fixed price. Ask for the fall heights and the surfacing depth in writing so you can compare quotes like for like.

  3. Installation

    Most primary schemes go in during a holiday: groundworks, footings, frames, then surfacing. Small trails and single pieces can take a few days; a whole playground two to four weeks.

  4. Post-installation inspection

    An independent inspection to BS EN 1176 before children use it, the maker’s maintenance manual, and a routine check sheet for your site team.

Questions schools ask

What outdoor play equipment does an EYFS setting need?

There is no fixed list. Most good areas have low climbing, a den or playhouse, sand and water or a mud kitchen, a path for wheeled toys, shade, storage and plenty of loose parts.

How much does an early years outdoor area cost?

A single climbing unit is about £6,000 to £20,000 installed. Small improvements can be done for under £10,000; a full redesign with surfacing, shelter and planting has cost one primary school £169,535 through a public contract.

Does EYFS equipment need safety surfacing?

Anything with a free height of fall above 600 mm needs an impact-absorbing surface over its impact area. Lower equipment can sit on grass, artificial grass or other suitable ground.

Is artificial grass suitable for an EYFS area?

Yes for general play and over low equipment. Where there is a fall height, it needs a tested shock pad underneath at the right depth. Plain artificial grass on its own is not an impact-absorbing surface.

Who inspects early years play equipment?

Staff should check it routinely, ideally daily, and a competent independent inspector should do an annual inspection to BS EN 1176-7.

Do schools pay VAT on playground equipment?

Installers charge VAT at 20%. Maintained schools and academies can usually reclaim it, so budgets are normally set before VAT. PTAs that are separate charities usually cannot, so a PTA-funded project should budget the full amount. Check with your finance lead.

Tell us about your early years area

Three short steps: where the school is, what you have in mind, and how to reach you. It takes about two minutes.

This is a free matching service, not a play equipment installer. We tell you which installer we have found before they see your brief.

Step 1 of 3

Where is the school?
Get free quotes